This depends on several factors. Level 2 AC chargers can typically be shipped immediately after receiving an order. The installation process, however, depends on the situation at the site. Installing EV chargers includes a planning stage and a verification stage to make sure that the site has ample electricity available for the planned deployment. For Level 3 DC chargers, lead times vary depending on the charger and on whether additional infrastructure is necessary to perform the installation.